首页> 美国政府科技报告 >Zinc Production Practice at Zhuzhou Smelter, Hunan, China
【24h】

Zinc Production Practice at Zhuzhou Smelter, Hunan, China

机译:湖南株洲冶炼厂锌生产实践

获取原文

摘要

The zinc plant of Zhuzhou smelter uses a conventional hydrometallurgical process with two-stage leaching and the Waelz process for treatment of leaching residue. Many technical improvements have been made since the plant went on stream in 1968. A high recovery of zinc, high-grade zinc and other products, good overall utilization of raw materials and good technical-economic targets have been obtained in the plant. The basic characteristics of the technology are: (1) hydro-transportation and continuous leaching of the calcine; (2) improved leaching process providing good conditions for pulp clarification and solution purification; (3) treatment of zinc oxide with preliminary F, Cl volatilization and In, Ge, Ga and Tl recovery; (4) low energy consumption in solution purification and electro-winning; (5) volatilizing process for treatment of leach on residue and fixing As in the clinker; and (6) advanced comprehensive utilization of the zinc concentrates, from which Zn, Pb, Cu, Cd, Co, In, Ge, Ga, Tl, S and Ag are recovered.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号