首页> 美国政府科技报告 >Operating GRI's (Gas Research Institute's) Mobil T and C (Testing and Control) Facility. Tight Gas Sands Research Program: Field Operations and Analysis. Final Report October 1983-November 1988
【24h】

Operating GRI's (Gas Research Institute's) Mobil T and C (Testing and Control) Facility. Tight Gas Sands Research Program: Field Operations and Analysis. Final Report October 1983-November 1988

机译:经营GRI(天然气研究所)的美孚T和C(测试和控制)设施。致密气砂研究计划:现场作业和分析。最终报告1983年10月至1988年11月

获取原文

摘要

The Gas Research Institute has implemented a field research program to learn more about the hydraulic fracturing process. In order to insure accurate and reliable data were collected for analysis, the Mobile Testing and Control (T&C) Facility was built. This equipment was used to collect data on well tests, stress tests, mini-fracs and hydraulic fracture treatments during the five years of the project. The report summarizes all the work performed using the Mobile T&C Facility, research conducted, and the results of analyses on cooperative research wells in the program.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号