Construction Evaluation of Hydraway Edge Drain and Outlet Pipes on Interstate 64

机译:64号州际公路Hydraway边排水管道施工评价

获取原文

摘要

The report documents the installation of the Hydraway edge drain (version two) onI-64 in Franklin-Woodford-Scott and Fayette Counties. The edge drain was placed on the back side of the trench against the shoulder and backfilled with a sand/slurry. From observations on the project and several previous projects, the sand/slurry backfill helps to insure the integrity of the drainage system during initial backfilling. It is apparent that the sand slurry backfill provides a better installation in comparison to previous methods using excavated trench material. Notable trench settlement did occur on the project. It is apparent that insufficient water was used to properly densify the sand. From observations on other projects, it appears that approximately one gallon per linear foot is required to achieve proper density.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号