首页> 美国政府科技报告 >Launch pad to the moon: Construction bidding cost of Launch Complex 39, part 1
【24h】

Launch pad to the moon: Construction bidding cost of Launch Complex 39, part 1

机译:发射台到月球:发射综合体39的建设投标成本,第1部分

获取原文

摘要

This report discusses and summarizes the major construction contracts of Apollo Launch Complex 39 with methods, bid costs, and unit prices totaling over 200,000,000. These separate contracts were for design; dredging and fill; foundations, steel piles, and vibroflotation; structural steel; general construction; outfitting High Bay no. 2; additional elevators; and bridge cranes for the Vehicle Assembly Building, the world's largest building at the time of construction. Other major facilities and machines of LC-39 are Launch Pads A, B, and Crawlerway, Mobile Service Structure, Crawler Transporter, Industrial Water Supply, and Propellant System Components Laboratory. Some especially interesting construction methods used were critical path method of scheduling and payment, beam hanger suspended forming system eliminating 524 feet high shoring, four-story railcar cages for handing insulated siding, vibratory sonic hammers for steel piling, and helicopters for special lifting.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号