首页> 美国政府科技报告 >Routine inspection effort required for verification of a nuclear material production cutoff convention
【24h】

Routine inspection effort required for verification of a nuclear material production cutoff convention

机译:核查核材料生产停产公约所需的例行检查工作

获取原文

摘要

Preliminary estimates of the inspection effort to verify a Nuclear Material Cutoff Convention are presented. The estimates are based on a database of about 650 facilities in a total of eight states, the five nuclear-weapons states and three ''threshold'' states plus facility-specific inspection requirements. Typical figures for inspection requirements for specific facility types derive from IAEA experience, where applicable. Alternative estimates of inspection effort are used in cutoff options where full IAEA safeguards are not stipulated.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号