首页> 美国政府科技报告 >Prognostic Health Monitoring System: Component Selection Based on Risk Criteria and Economic Benefit Assessment. 3rd International Conference on NPP Life Management (PLiM) for Long Term Operations (LTO).
【24h】

Prognostic Health Monitoring System: Component Selection Based on Risk Criteria and Economic Benefit Assessment. 3rd International Conference on NPP Life Management (PLiM) for Long Term Operations (LTO).

机译:预后健康监测系统:基于风险标准和经济效益评估的组件选择。第三届核电厂生命管理(pLim)长期运营国际会议(LTO)。

获取原文

摘要

Prognostic health monitoring (PHM) is a proactive approach to monitor the ability of structures, systems, and components (SSCs) to withstand structural, thermal, and chemical loadings over the SSCs planned service lifespan. The current efforts to extend the operational license lifetime of the aging fleet of U.S. nuclear power plants from 40 to 60 years and beyond can benefit from a systematic application of PHM technology. Implementing a PHM system would strengthen the safety of nuclear power plants, reduce plant outage time, and reduce operation and maintenance costs. However, a nuclear power plant has thousands of SSCs, so implementing a PHM system that covers all SSCs requires careful planning and prioritization. This paper therefore focuses on a component selection that is based on the analysis of a components failure probability, risk, and cost. Ultimately, the decision on component selection depends on the overall economical benefits arising from safety and operational considerations associated with implementing the PHM system.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号