首页> 美国政府科技报告 >Normal Operation (NO) of APT Blanket System and its Components Based on Initial211 Conceptual Design
【24h】

Normal Operation (NO) of APT Blanket System and its Components Based on Initial211 Conceptual Design

机译:基于Initial211概念设计的apT毯系统及其构件的正常运行(NO)

获取原文

摘要

This report is one of a series of reports documenting accident scenario211u001esimulations for the Accelerator Production of Tritium (APT) blanket heat removal 211u001esystems. The simulations were performed in support of the Preliminary Safety 211u001eAnalysis Report (PSAR) for the APT.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号