首页> 美国政府科技报告 >Draft Supplement to the Environmental Statement, Fiscal Year 1976 Proposed Program. Facility Location Evaluation for Yale Service (Raft Substation), Study Area 75-10
【24h】

Draft Supplement to the Environmental Statement, Fiscal Year 1976 Proposed Program. Facility Location Evaluation for Yale Service (Raft Substation), Study Area 75-10

机译:环境声明补充草案,1976财政年度拟议计划。耶鲁服务(筏式变电站)设施位置评估,研究区域75-10

获取原文

摘要

The statement describes the environmental impacts resulting from the construction of a new substation near Yale, Idaho, approximately 22 miles from Burley, Idaho. Land requirements for the new substation would be approximately 2 acres and an access road less than 100 feet in length would also be required. Depending on the final site location chosen, 2 acres of cropland (Alternatives 1 and 2) or 2 acres of grassland (Alternative 3) would be taken out of production. Disturbance of wildlife during construction and loss of habitat associated with the land requirements described above would occur. Some soil erosion as a result of grading will occur and increased runoff and sedimentation into the Raft River may occur. The facility would be visible from I-15 and Raft River Road.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号