首页> 美国政府科技报告 >Engineer, Design, Construct, Test, and Evaluate a Pressurized Fluidized Bed Pilot Plant Using High Sulfur Coal for Production of Electric Power. Phase I, Preliminary Engineering, Task 3, Site Evaluation. Site Evaluation Report
【24h】

Engineer, Design, Construct, Test, and Evaluate a Pressurized Fluidized Bed Pilot Plant Using High Sulfur Coal for Production of Electric Power. Phase I, Preliminary Engineering, Task 3, Site Evaluation. Site Evaluation Report

机译:工程师,设计,建造,测试和评估使用高硫煤生产电力的加压流化床试验工厂。第一阶段,初步工程,任务3,现场评估。现场评估报告

获取原文

摘要

The Curtiss--Wright PFB Pilot Plant site is located in a full transportation service area with both intramodal and intermodal rail, truck, and air carrier operations sufficient to meet the requirements of the proposed construction project. (ERA citation 04:029909)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号