GRID CONNECTED INTEGRATED COMMUNITY ENERGY SYSTEM Final Report, Phase II, November 9, 1977-March 22, 1978, Stage 2 Volume 2 of 2

机译:网格连接集成社区能源系统最终报告,第二阶段,1977年11月9日 - 1978年3月22日,第2阶段第2卷,共2期

获取原文

摘要

Work plans for Phase III and also for Phases IV, V, and VI were revised. There was very little change from these work plans as presented in the Phase I report;the work scopes remained essentially the same;there were nominal reductions in manpower schedules and corresponding cost reductions. A schedule of procurement for long-lead items was included with the Phase III work plan.nNOPSI's updated rate schedule, based on data developed during the Phase II study, is one of the Task IIb documents, as are statements relative to possible zoning variances and a labor relations plan for ICES plant system operation. A preliminary environmental assessment is presented in Section 2b.9.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号