Conversion of Rapid City Pilot Plant: Phase II, Preliminary Detailed Design. Volume III. Design and Construction Cost Estimates, Overall-Program Costs and Schedule. Phase II Final Report, December 15, 1977--August 15, 1978

机译:快速城市试验工厂的转换:第二阶段,初步详细设计。第三卷。设计和施工成本估算,总体计划成本和进度。第二阶段最终报告,1977年12月15日 - 1978年8月15日

获取原文

摘要

The costs associated with the design and construct phases, III and IV, were developed from the detail contained in Volume II of this report. Those costs plus those for the plant startup and test program, the latter items being detailed in Volume I, are reported here, in Volume III. In addition the overall design/construct/test program schedule is developed and presented here. (ERA citation 04:025207)

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号