Dry Falls Dam Potential Hydroelectric Power. Feasibility Study

机译:干瀑布坝潜在水力发电。可行性研究

获取原文

摘要

The feasibility of constructing a low-head hydroelectric power plant at the existing Dry Falls Dam in Washington was studied considering technical, economic, environmental, regulatory, and safety factors. As a result of this study it is recommended that a 12 MW power plant be installed. Annual energy production would be 56 million kWh at an initial cost of 21.2 mills/kWh. (ERA citation 05:005508)