首页> 美国政府科技报告 >Fort St. Vrain Experience: First Refueling/Maintenance Outage. Final Report
【24h】

Fort St. Vrain Experience: First Refueling/Maintenance Outage. Final Report

机译:Fort st. Vrain体验:第一次加油/维修停运。总结报告

获取原文

摘要

The overall objective of this research project was to observe critical portions of the first refueling/maintenance outage at the Fort St. Vrain HTGR and to document those significant experiences during the outage as they relate to gas-cooled reactor plants which may be designed, built, and operated in the future. The purpose of this work was to provide insights from the experiences during this first refueling at a commercial-sized HTGR which may be valuable in the design and operation of future plants using similar technology.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号