首页> 美国政府科技报告 >Development of Automated Welding Process for Field Fabrication of Thick Walled Pressure Vessels. Technical Progress Report, Second Quarter, FY 1980, Ending March 28, 1980
【24h】

Development of Automated Welding Process for Field Fabrication of Thick Walled Pressure Vessels. Technical Progress Report, Second Quarter, FY 1980, Ending March 28, 1980

机译:厚壁压力容器现场制作自动焊接工艺的发展。技术进步报告,1980年第二季度,1980年3月28日结束

获取原文

摘要

Progress on a metallurgical contract is reported: (1) specifications of 2 1/4 chromium-1 molybdenum low alloy steel plate for a coal gasification project; (2) methods of welding and analyses of helium-argon mixtures for welding; and (3) tensile properties of welded joints. (ERA citation 05:031463)

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号