首页> 美国政府科技报告 >Radiological Controls for Plutonium Contaminated Process Equipment Removal from the 232-Z Contaminated Waste Recovery Process Facility at the Plutonium Finishing Plant
【24h】

Radiological Controls for Plutonium Contaminated Process Equipment Removal from the 232-Z Contaminated Waste Recovery Process Facility at the Plutonium Finishing Plant

机译:钚污染工艺设备的放射控制从钚整理厂的232-Z污染废物回收工艺设施中移除

获取原文

摘要

The 232-2 facility at Hanford's Plutonium Finishing Plant operated as a plutonium scrap incinerator for 11 years. Its mission was to recover residual plutonium through incinerating and/or leaching contaminated wastes and scrap material. Equipment failures, as well as spills, resulted in the release of radionuclides and other contamination to the building, along with small amounts to external soil. Based on the potential threat posed by the residual plutonium, the U.S. Department of Energy (DOE) issued an Action Memorandum to demolish Building 232-2, Comprehensive Environmental Response Compensation, and Liahility Act (CERC1.A) Non-Time Critical Removal Action Memorandum for Removal of the 232-2 Waste Recovery Process Facility at the Plutonium Finishing Plant (04-AMCP-0486).

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号