首页> 美国政府科技报告 >Investigation of the Geokinetics' Horizontal in-Situ Oil Shale Retorting Process. Quarterly Report, October-December 1982
【24h】

Investigation of the Geokinetics' Horizontal in-Situ Oil Shale Retorting Process. Quarterly Report, October-December 1982

机译:地球动力学水平井下油页岩干馏工艺研究。 1982年10月至12月的季度报告

获取原文

摘要

Progress achieved during the quarter ending December 1982 is reported. As of December 31, 1982, Retort No. 26 had produced 19,545 barrels of oil, as measured in the storage tanks. Approximately 11,626 barrels of oil had been produced during the fourth quarter. Air has been injected into the retort at an average rate of 4714 scfm over the life of the burn. By the quarter's end, the fire front had advanced to a point 215 feet downstream of the air-injection wells, except for a narrow portion along the south edge. As of December 31, all air-in and air-out wells have been drilled, and stemming has commenced on Retort No. 27. Twelve production and eleven observation wells are in partial completion, and 55 instrumentation wells had been drilled and their accompanying instruments installed. Construction of the air-in and off gas manifolding is underway. Post-blast coring on Retort No. 28 was completed in November. Re-entry drilling has progressed during the quarter. Laboratory work on a variety of projects and environmental studies have also continued. (ERA citation 08:014006)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号