首页> 美国政府科技报告 >Electron Beam Flue Gas Cleanup Process Development Unit: Size Reduction and Cost Impact Study. Supplementary Technical Report, 4 October 1982-31 March 1983
【24h】

Electron Beam Flue Gas Cleanup Process Development Unit: Size Reduction and Cost Impact Study. Supplementary Technical Report, 4 October 1982-31 March 1983

机译:电子束烟气净化工艺开发单位:尺寸减小和成本影响研究。补充技术报告,1982年10月4日至1983年3月31日

获取原文

摘要

The proposed electron beam (e-beam)flue gas cleanup process development unit program has been analyzed to investigate methods of reducing total project cost.Two major program elements were analyzed in detail: (1) equipment and installation, and (2) test program. Results indicate that reducing the maximum design flow rate and shortening the test period can significantly reduce total project cost while still maintaining most of the original project goals. (ERA citation 08:043215)

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号