Closeout Report for the Decontamination and Decommissioning of the 203-S, 204-S, 205-S Facilities

机译:关于203-s,204-s,205-s设施的净化和退役的结算报告

获取原文

摘要

The obsolete 203-S, 204-S, 205-S uranium nitrate hexahydrate purification and storage facility and the radioactive waste tank car unloading equipment in the 200 West Area of the US Department of Energy Hanford Site were decontaminated and decommissioned. Aboveground facilities were dismantled and the area was backfilled with a minimum of 2 feet of clean fill over remaining underground concrete structures and piping. Fencing was removed and the site was released as a clean area with underground contamination. The 13-month project was completed by Rockwell Hanford Operations' new Decontamination and Decommissioning forces three months ahead of schedule and $275,000 under budget. 46 figures. (ERA citation 10:001984)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号