首页> 美国政府科技报告 >Integrated Global Background Monitoring Network. Preliminary Results from Torres Del Paine and Olympic National Parks
【24h】

Integrated Global Background Monitoring Network. Preliminary Results from Torres Del Paine and Olympic National Parks

机译:综合全球背景监测网络。托雷斯德尔潘恩和奥林匹克国家公园的初步结果

获取原文

摘要

During 1984, a pilot project was initiated for monitoring pollution at Torres del Paine National Park in southern Chile and Olympic National Park in the United States. These are two of three initial sites that are to be established as part of an integrated global backgound monitoring network. Eventually, the plan is to establish a world-wide system of such sites. We collected and analyzed samples of the soil, water, air, and two species of plants (moss and lichen). We also collected and analyzed samples of the forest litter. We compared the samples of soil and vegetation against reference samples. We also compared samples of soil, vegetation, and of organic material from Torres del Paine against similar samples from Olympic and Sequoia-Kings Canyon National Parks in the United States. Although the data is preliminary, it is in agreement with out initial hypothesis that Torres del Paine and Olympic National Parks are not a polluted sites. (ERA citation 12:001495)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号