首页> 美国政府科技报告 >Hayden Station Power Plant Maintenance System Preventive Maintenance Program. Final Report
【24h】

Hayden Station Power Plant Maintenance System Preventive Maintenance Program. Final Report

机译:海登站电厂维护系统预防性维护计划。总结报告

获取原文

摘要

Result of the CUEA Preventive Maintenance Program is that the number of corrective work orders at Hayden Station is decreasing while the amount of preventive maintenance work is increasing. Other results are: the need to perform work on a highest-priority basis has been reduced by 19%; overtime work, previously 11%, has been as low as 1/2%; the maintenance backlog has been reduced by 15%; maintenance costs are down by 26%; and direct maintenance work productivity has increased 6.2%. Equivalent availability (power generating capability) has improved 22% on generating Unit 1 and 11% on generating Unit 2; and forced outage rates are down 6.8% on generating Unit No. 1 and 2.3% on generating Unit No. 2. Although the final net cost benefit will not be known until after several years of operation, it is now estimated that the net benefit at the Hayden Station will be in excess of $1.0 million per year. (ERA citation 11:015967)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号