首页> 美国政府科技报告 >Project Plan for Taft-Bell 500 KV Transmission Line on Federal Lands
【24h】

Project Plan for Taft-Bell 500 KV Transmission Line on Federal Lands

机译:联邦土地上Taft-Bell 500 KV输电线路项目规划

获取原文

摘要

The project described includes the Taft-Bell 500 kV Transmission Line. This facility crosses 52.05 miles of National Forest System lands, and 2.54 miles of lands managed by the Bureau of Land Management. Between the Coeur d'Alene River and Wallace, a 10.5 mile portion will parallel the Washington Water Power Company's Noxon-Wallace-Pine Creek 230 kV Transmission Line. BPA will do road construction and right-of-way clearing for both The Washington Water Power Company and BPA transmission lines in this parallel area. This Project Plan is a compilation of Points of Agreement. It is intended to serve as permanent documentation and as a field guide during the construction period. (ERA citation 11:004124)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号