首页> 美国政府科技报告 >RELAP5/MOD2 Analysis of a Postulated 'Cold Leg SBLOCA' Simultaneous to a 'Total Black-Out' Event in the Jose Cabrera Nuclear Station
【24h】

RELAP5/MOD2 Analysis of a Postulated 'Cold Leg SBLOCA' Simultaneous to a 'Total Black-Out' Event in the Jose Cabrera Nuclear Station

机译:RELap5 / mOD2分析假设的“冷腿sBLOCa”同时发生在Jose Cabrera核电站的“全面停电”事件

获取原文

摘要

The RELAP5/MOD2/36.04 code has been used on a CYBER 180/830 computer and the simulation includes the 6 inches RHRS charging line, the 2 inch pressurizer spray, and the 1.5 inch CVCS make-up line piping breaks. The assumption of a 'total black-out condition' coincident with the occurrence of the event has been made in order to consider a plant degraded condition with total active failure of ECCS. As a result of the analysis, estimates of the 'time to core overheating startup' as well as an evaluation of alternate operator measures to mitigate the consequences of the event have been obtained. Finally, a proposal for improving the LOCA emergency operating procedure (E-1) has been suggested.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号