首页> 美国政府科技报告 >Quality Assurance Project Plan for the in situ soil mixing and physicochemical treatment processes for removal of trichloroethylene and other VOCs from the X-231B Oil Biodegradation Unit, Portsmouth Gaseous Diffusion Plant, Revision 1. Environmental Resto
【24h】

Quality Assurance Project Plan for the in situ soil mixing and physicochemical treatment processes for removal of trichloroethylene and other VOCs from the X-231B Oil Biodegradation Unit, Portsmouth Gaseous Diffusion Plant, Revision 1. Environmental Resto

机译:质量保证项目计划从X-231B油生物降解装置,朴茨茅斯气体扩散装置,修订版1中去除三氯乙烯和其他挥发性有机化合物的原位土壤混合和物理化学处理过程。环境恢复

获取原文

摘要

This Quality Assurance Project Plan (QAPP) establishes the requirements for control of quality affecting activities associated with the field-scale demonstration project designed to produce an effective solution for environmental restoration of chlorinate ...

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号