首页> 美国政府科技报告 >Construction Project for the Conversion of the Amelia Earhart Facility, Germany
【24h】

Construction Project for the Conversion of the Amelia Earhart Facility, Germany

机译:德国amelia Earhart设施改建项目

获取原文

摘要

The audit was performed in response to a complaint to the Defense Hotline. The complaint alleged that the plan by the U.S. Army Engineer District Europe to gut the Amelia Earhart building was unnecessary and was based on the U.S. Army Engineer District Europe 5 preference for large and open work spaces. The complaint alleged that the Government could save about $2.2 million if existing walls and bathrooms were not demolished. Further, the complaint alleged that work was improperly classified and funded and that minor construction costs exceeded the statutory limit of $300,000. Objectives. The audit objectives were to determine whether the scope of the construction project was excessive and whether the work was properly classified and funded. We also evaluated the effectiveness of the management controls as they applied to the other objectives. A separate report will discuss other funding issues related to the Amelia Earhart project and other projects.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号