首页> 美国政府科技报告 >Depot Maintenance: Lessons Learned from Transferring Alameda Naval Aviation DepotEngine Workloads
【24h】

Depot Maintenance: Lessons Learned from Transferring Alameda Naval Aviation DepotEngine Workloads

机译:仓库维护:转移阿拉米达海军航空仓库发动机工作量的经验教训

获取原文

摘要

The Base Closure and Realignment Commission's July 1993 recommendations for baseclosures and realignments included closing three of the Navy' six aviation depots. One of these was the Alameda Naval Aviation Depot, California. Accordingly, the maintenance workloads performed at those facilities were redistributed to remaining depots operated by the Navy and other services. The Alameda depot performed maintenance on the TF34 turbine engine, used by the Navy on the 53 aircraft and by the Air Force on the A-10 aircraft, and the Navy's version of the T56 turbine engine used on C-130, P-3, and E-2 aircraft. The Alameda workload for the TF34 engines was transferred to the Jacksonville Naval Aviation Depot, Florida, and the T56 engine workload was added to the existing Air Force T56 workload at the San Antonio Air Logistics Center, Texas. The transition of maintenance capability to these facilities began in June 1994 and was completed by May 1996.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号