首页> 美国政府科技报告 >Final Post Removal Action Risk Evaluation for Building 42, Building 43, Coal Storage Area 3, and Building 77 of the Surplus Operable Unit, Fort Sheridan, Illinois
【24h】

Final Post Removal Action Risk Evaluation for Building 42, Building 43, Coal Storage Area 3, and Building 77 of the Surplus Operable Unit, Fort Sheridan, Illinois

机译:伊利诺伊州谢里登堡剩余可操作单元42号楼43号楼,煤炭储存区3号楼和77号楼的最后拆除行动风险评估

获取原文

摘要

In 1988, Fort Sheridan, illinois was recommended to the Secretary of Defense for closure by the Commission on Base Realignment and Closure (BRAC). To support decisions regarding preparation of the property for release, the Department of the Army is implementing environmental studies and restoration activities (if needed) before property transfer. The U.S. Army Environmental Center (USAEC), as part of the Army staff, is assisting Fort Sheridan in this work. The scope of work, as detailed in the Overall Quality Assurance Project Plan (OQAPP) Environmental Science & Engineering, Inc. (ESE), 1995a and the various sampling and analysis plans (SAPs) for Fort Sheridan, includes characterizing known and potential environmental problems at numerous study areas in the Surplus Operable Unit (OU) by sampling various environmental media and analyzing the samples for the presence of constituents of interest.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号