首页> 美国政府科技报告 >Environmental Assessment for Closure of Cesspools and Implementation of Wastewater Management and Treatment Measures at Bellows Air Force Station, Hawaii.
【24h】

Environmental Assessment for Closure of Cesspools and Implementation of Wastewater Management and Treatment Measures at Bellows Air Force Station, Hawaii.

机译:夏威夷波纹空军基地关闭污水池的环境评估和污水管理及处理措施的实施。

获取原文

摘要

The USAF has prepared this Environmental Assessment (EA) to assess the potential environmental effects that may result from closing 29 existing cesspools and installing 26 regulatory compliant wastewater treatment systems at existing cabins. Three action alternatives and a No Action Alternative were considered in this EA. The action alternatives include the following: (1) installation of onsite aerobic treatment units (ATU), dispose of treated effluent using subsurface drip lines and plant native Hawaiian vegetation above the driplines (2) installation of ATUs and convert the LCCs to seepage pits for disposal of treated effluent, and (3) install ATUs and store treated effluent in wastewater holding tanks for approved re-use options.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号