首页> 美国政府科技报告 >Environmental Assessment Addressing Gate Complex Construction at Scott Air Force Base, Illinois.
【24h】

Environmental Assessment Addressing Gate Complex Construction at Scott Air Force Base, Illinois.

机译:环境评估解决伊利诺斯州斯科特空军基地的大门复杂建筑问题。

获取原文

摘要

Introduction. Federal actions that potentially involve significant impacts on the environment must be reviewed in accordance with the National Environmental Policy Act (NEPA) and all other applicable laws. The U.S. Air Force (USAF) has completed an Environmental Assessment (EA) to address the potential environmental consequences associated with the USAF proposal to construct and operate a new access gate complex at Scott AFB, Illinois, and associated activities. Purpose of and Need for the Proposed Action. The purpose of the Proposed Action is twofold. First, the Proposed Action is to replace the existing Cardinal Creek Gate with a modern access gate complex that is capable of processing the increased number of vehicles accessing the installation following the construction of the proposed interchange with Interstate 64 (1-64 ). Second, the Proposed Action is to replace the commercial vehicle inspection facilities at the Mascoutah Gate with a facility at the Cardinal Creek Gate that meets a11 appropriate antiterrorism/force-protection (AT/FP) requirements. The Proposed Action is needed because the existing Cardinal Creek Gate would not be able to accommodate the increased traffic volume following the construction of the new Rieder Road interchange with 1-64. The substandard infrastructure at the existing Cardinal Creek Gate prevents the gate from being operated more than 4 hours per day and does not allow for bidirectional traffic flow. The Proposed Action is also needed because the commercial vehicle inspection facility at the Mascoutah Gate does not meet all appropriate AT/FP requirements.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号