Civil Works Budget Details of the U.S. Army Corps of Engineers for Construction. Volume 2: SAD - SWD. Fiscal Year 2015.

机译:美国陆军建筑工程兵团的土建工程预算细节。第2卷:saD - sWD。 2015财年。

获取原文

摘要

DESCRIPTION: The Major Rehabilitation Report (MRR), approved in November 2000, divided the dike into 8 Reaches and included a detailed analysis of alternatives in Reach 1. The MRR proposed construction of a seepage/drainage berm along the landside toe of the dike for Reach 1. Following input from a variety of expert sources, the U.S. Army Corps of Engineers (Corps) convened an independent technical review panel to further evaluate the design of the proposed repairs, which were underway. After reviewing the findings of this panel, the Corps decided to fundamentally alter its plans for strengthening the HHD. The new design concept includes toe-ditch fill, cut-off wall at the center of the dike, and seepage berm. The former Reach by Reach approach has now been replaced with a system wide risk reduction approach as required for safety modifications to dams. This risk reduction strategy is being implemented by addressing the culvert structures as the first order of work while completing the ongoing Dam Safety Modification Study (DSMS) which includes the entire HHD system. The cutoff wall installation to address seepage and piping in Reach 1 between the cities of Port Mayaca and Belle Glade, Florida has been completed.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号