首页> 美国政府科技报告 >Salang Hospital: Lack of Water and Power Severely Limits Hospital Services, and Major Construction Deficiencies Raise Safety Concerns.
【24h】

Salang Hospital: Lack of Water and Power Severely Limits Hospital Services, and Major Construction Deficiencies Raise Safety Concerns.

机译:salang医院:缺乏水和电力严重限制医院服务和重大建筑缺陷引发安全问题。

获取原文

摘要

Salang hospital was not built in accordance with contract requirements. In mid-2012, a U.S. Forces-Afghanistan (USFOR-A) task force inspected the site during construction and found a number of deficiencies, including water, sewer, electrical, and heating systems that were incomplete or needed repair. The task force noted the inhabitants of Salang district would have inadequate access to healthcare until construction deficiencies were remedied and missing equipment provided. In November 2012, the contractor was paid in full. However, SIGAR s November 2013 inspection found that the deficiencies identified by the task force had not been corrected. For example, the water well, solar power system, and second 30 kilowatt generator required by the contract had not been provided. Because there was no clean water, staff at the hospital were washing newborns with untreated river water. SIGAR s inspectors identified additional problems. For example, the original design drawings called for three one-story buildings a 15-room hospital, a four-stall toilet, and a guard shack but SIGAR found that a single, poorly constructed, two-story building had been built.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号