首页> 美国政府科技报告 >RESULTS OF TESTS PERFORMED ON 6-INCH-DIAMETER CORES FROM PREPACKED CONCRETE CLEAR CREEK POWERPLANT - UNITS 1 AND 2 TRINITY ROWERPLANT UNIT 2 TRINITY RIVER DIVISION CENTRAL VALLEY PROJECT
【24h】

RESULTS OF TESTS PERFORMED ON 6-INCH-DIAMETER CORES FROM PREPACKED CONCRETE CLEAR CREEK POWERPLANT - UNITS 1 AND 2 TRINITY ROWERPLANT UNIT 2 TRINITY RIVER DIVISION CENTRAL VALLEY PROJECT

机译:从预制的混凝土清晰的CREEK动力装置上进行6英寸直径岩心试验的结果 - 第1和第2单元的ROWERpLaNT单元2 TRINITY RIVER DIVERIsION CENTaL VaLLEY pROJECT

获取原文

摘要

Normally in Bureau of Reclamation power plants the draft tubes and scroll cases are encased in conventional concrete, conventionally-placed and consolidated. However, specifications for many years have provided, on an alternate basis, for the use of prepacked concrete in these locations. The construction contractors for Clear Creek and Trinity Power plants were the first to select and apply this method of construction for encasing scroll cases and draft tubes.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号