首页> 美国政府科技报告 >Macrobehavior of Development Costs and Estimates (Stec Plots).
【24h】

Macrobehavior of Development Costs and Estimates (Stec Plots).

机译:开发成本和估算的宏观行为(stec plots)。

获取原文

摘要

This report provides the macrobehavior of development costs and estimates for these five systems: (1) PERSHING missile system; (2) SERGEANT missile system; (3) M561 (GAMA GOAT) truck; (4) SHERIDAN vehicle; and (5) Advanced Aerial Fire Support System (AAFSS)(AH-56A). The STEC plot is developed to present the normalized development data. A new RDTE quantitative macrobehavior measure, the EFFICACY RATING, is developed to describe, not judge, the development phase of a weapon system. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号