首页> 美国政府科技报告 >PROJECT TRINIDAD EXPLOSIVE EXCAVATION OF RAILROAD CUTS 2 AND 3 BY MOUNDING AND DIRECTED BLASTING
【24h】

PROJECT TRINIDAD EXPLOSIVE EXCAVATION OF RAILROAD CUTS 2 AND 3 BY MOUNDING AND DIRECTED BLASTING

机译:爆破与定向爆破工程TRINIDaD爆炸开挖2号和3号铁路

获取原文

摘要

This report summarizes the objectives, design, and results of two explosive excavation experiments performed as the final phase of Project Trinidad, a comprehensive series of tests to determine the cratering properties of inter-bedded sandstones and shales. The experiments were performed in September 1971 by the U.S. Army Engineer Waterways Experiment Station Explosive Excavation Research Laboratory. These final experiments were designed to excavate through-cuts for relocation of the Colorado and Wyoming Railroad at the Trinidad .Dam and Lake Project. The first of the two experiments tested a charge array designed to break up material within a 19,000-yd3 cut to facilitate .later removal of the material by mechanical means. The concept tested was mounding, a blasting technique An which charges are positioned with respect to the horizontal ground surface rather than a vertical bench face.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号