首页> 美国政府科技报告 >A Comprehensive Study of the Tocks Island Lake Project and Alternatives. Part A. Chapters I, II, III. Analysis of Service Areas and Resource Needs
【24h】

A Comprehensive Study of the Tocks Island Lake Project and Alternatives. Part A. Chapters I, II, III. Analysis of Service Areas and Resource Needs

机译:Tocks Island Lake项目及替代方案综合研究。 a部分,第一章,第二章,第三章。服务领域和资源需求分析

获取原文

摘要

The purpose of this study is to help decision makers determine future water resource needs of the Delaware River Basin area and ways of meeting these needs. This report, undertaken in 1975 for the U.S. Army Corps of Engineers by an independent consultant firm, describes the natural features of the study area, land use, employment, and population trends. A chapter in this volume focuses on the average annual flood damages of the area and reviews the existing flood damage reduction needs in the Delaware Basin. Water supply and water consumption for the Basin is also analyzed both for residential and industrial needs. Existing water supplies were inventoried and projections made to the year 2025. The most significant water supply need in the basin is found to be the flow necessary to prevent serious salinity intrusion in the Delaware Estuary. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号