首页> 美国政府科技报告 >Life Cycle Time and Cost Estimates for Squad Automatic Weapon System Candidates.
【24h】

Life Cycle Time and Cost Estimates for Squad Automatic Weapon System Candidates.

机译:小队自动武器系统候选人的生命周期时间和费用估算。

获取原文

摘要

This report documents for future reference the steps taken to prepare Life Cycle Cost and Schedule Estimates for the Squad Automatic Weapon System (SAWS) Program. All costs are given in FY75 dollars. The body of the report addresses a program which remains in Advanced Development from FY75 until FY77. The period encompassing FY77, FY78 and FY79 is the time frame for Engineering Development. This is followed by a 12 month Limited Production period and a subsequent Full Scale Production period. The Appendix gives the detailed Cost and Schedule Estimates from which the final Trade Off Determinations and Program Costs were derived. Five weapon mechanism concepts and six types of ammunition are approached in a variety of combinations. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号