首页> 美国政府科技报告 >Cost Effectiveness Study of Wastewater Management Systems for Selected U.S. Coast Guard Vessels. Volume III. Installation Analysis Part 6. POINT HERRON (82').
【24h】

Cost Effectiveness Study of Wastewater Management Systems for Selected U.S. Coast Guard Vessels. Volume III. Installation Analysis Part 6. POINT HERRON (82').

机译:美国海岸警卫队船舶废水管理系统的成本效益研究。第三卷。安装分析第6部分。点HERRON(82')。

获取原文

摘要

Each of the 18 candidate Wastewater Management System (WMS) configurations developed in Volume IV was analyzed for installation aboard the POINT HERRON (WPB-82318). The following information was developed: vessel conditions including locations of black water (sewage and garbage grinder slurry) and gray water (galley and turbid) waste sources, vessel/resources capacities and estimated usage rates, determination of viable candidate systems based on installation guidelines and assumptions developed in Volume IV, black and gray wastewater (or sludge) holding tank capacities which can be fitted, installation cost estimates for each viable candidate system, arrangement drawings for WMS equipment and waste sources, installation related effectiveness attribute data. The analysis was performed in three stages. A preliminary installation analysis was made on the basis of vessel plans available. This was followed by a shipcheck of the vessel to determine the viable candidate systems and obtain required vessel data. The final step consisted of a more detailed analysis of each viable candidate system to develop installation cost estimates and other required installation related information including arrangement drawings and effectiveness attribute data. Cost estimates were developed using a form which analyzes each viable candidate system in terms of standard installation cost elements, each of which has an assumed unit cost. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号