首页> 美国政府科技报告 >National Program for Inspection of Non-Federal Dams. Tighe Carmody Reservoir (MA 00499) Connecticut River Basin, Southhampton, Massachusetts. Phase 1 Inspection Report.
【24h】

National Program for Inspection of Non-Federal Dams. Tighe Carmody Reservoir (MA 00499) Connecticut River Basin, Southhampton, Massachusetts. Phase 1 Inspection Report.

机译:国家非联邦大坝检查计划。 Tighe Carmody水库(ma 00499)康涅狄格河流域,南安普顿,马萨诸塞州。第1阶段检验报告。

获取原文

摘要

This dam is a 1900 foot long, 160 foot high earth embankment dam, with a 300 foot long concrete spillway. The visual inspection did not disclose any findings that indicate an immediate unsafe condition. Based on size and hazard classifications in accordance with the Corps guidelines, the test flood is the Probable maximum Flood. The spillway for this dam is capable of passing the PMF without overtopping of the dam. Although this dam appears to be in generally good condition, the downstream slope was so heavily grown over that a thorough inspection could not be made. It is recommended that the owner have the downstream face of the dam cleared of vegetation to permit proper inspection of the slope. The owner should also obtain and make available past inspection reports and instrumentation readings so that they may be reviewed.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号