首页> 美国政府科技报告 >CLEAN COKE PROCESS Process Development Studies Final Report VOLUMEⅢ - FINAL PROCESS DESIGN AND ECONOMICS PART 2: PROCESS ECONOMICS
【24h】

CLEAN COKE PROCESS Process Development Studies Final Report VOLUMEⅢ - FINAL PROCESS DESIGN AND ECONOMICS PART 2: PROCESS ECONOMICS

机译:清洁焦过程过程开发研究最终报告第三卷 - 最终过程设计和经济学第二部分:过程经济学

获取原文

摘要

An economic analysis was made of a Clean Coke facility designed to process 12.43 million tons per year of Illinois No. 6 coal. The product list included 3.6 million tons per year of form coke pellets, 1.5 million tons of chemical products, and more than 33 trillion Btu of liquid fuel. With a total investment of $1.75 billion and with coke, chemicals, and fuels priced at $150 per ton, $256 per ton (average), and $2.50 per million Btu, respectively, an14 percent return on investment was projected.nBy replacing Clean Coke hydrogenation with an SRC process variation and producing briquettes instead of pellets, the plant investment was reduced by $130 million, and the net result was an improvement in profitability, to a projected return of better thann15 percent.

著录项

  • 作者

  • 作者单位
  • 年度 1978
  • 页码 1-41
  • 总页数 41
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com