Identification and Definition of the Management Cost Elements for Contractor Furnished Equipment and Government Furnished Equipment.

机译:承包商家具设备和政府家具设备管理成本要素的识别与定义。

获取原文

摘要

ASPR requires that the program manager perform a cost analysis to determine which components should be procured as GFE instead of being purchased from the prime contractor as CFE. Many cost factors contribute to the decision to provide an item as CFE or GFE. One cost that must be considered is the cost of managing the item, which includes, for example, personnel costs and government and contractor overhead costs. The authors have identified, defined, and assessed the use of relevant and practical elements of contractor and government management cost that should be considered in the CFE/GFE selection process. The study shows that the cost elements are considered important, but not frequently considered, and generally management cost analysis is inadequate. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号