首页> 美国政府科技报告 >Management Information Systems. Integrated Facilities System (IFS). Volume 2. Integrated Facilities Baseline Generation (IFBG) (DOS-E)
【24h】

Management Information Systems. Integrated Facilities System (IFS). Volume 2. Integrated Facilities Baseline Generation (IFBG) (DOS-E)

机译:管理信息系统。综合设施系统(IFs)。第2卷。综合设施基线生成(IFBG)(DOs-E)

获取原文

摘要

The conversion of the Integrated Facilities System from local automated or manual systems consists of a baseline generation period and an operational cutover period. During the baseline generation period, those master files necessary for cutover to live operations will be generated. To accomplish the creation of required master files, and selected portions of the IFS operational system that pertain to editing, file building, file maintenance, and file visibility will be executed. All of the cycles required for baseline generation are contained in USACSC Manual 18-1-B-AKA, Vol III (Operations and Scheduling), with the exception of two One Time cycles which are included in this document. The purpose of this document is to provide instructions on how to use the Operations and Scheduling Manual for baseline generation. Included are narrative descriptions of each cycle, instructions on how to structure each cycle, purpose, and suggested sequence of cycles.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号