首页> 美国政府科技报告 >Estimated Snow, Ice, and Rain Load Prior to the Collapse of the Hartford Civic Center Arena Roof.
【24h】

Estimated Snow, Ice, and Rain Load Prior to the Collapse of the Hartford Civic Center Arena Roof.

机译:在哈特福德文娱中心竞技场屋顶倒塌之前估计积雪,冰和雨负荷。

获取原文

摘要

The roof of the Hartford, Connecticut, Civic Center Arena collapsed under an unknown load of snow, ice and rain early in the morning on 18 January 1978. Based on available meteorological and snow load measurements, estimates for the amount of load present at the time of failure are made using a number of techniques. In addition, previous maximum loads due to snow, ice or rain since the building was constructed are also estimated. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号