Multiple Resource Leveling in Construction Systems through Variation of Activity Intensities

机译:通过改变活动强度在施工系统中实现多种资源调配

获取原文

摘要

The resource leveling problem for a construction system producing a stream of output units is considered. The system is modeled using a critical-path-analysis activity network, from which an extended network is developed for an integrated planning effort of all output units. Activity intensity variables are defined which measure activity demand rates for resources and consequent activity durations for the production of each output unit. A heuristic approach consisting of an iterative non-linear programming procedure is presented which computes activity durations (intensities) for the minimization of resource capacity costs subject to meeting construction due dates. The application of a major ship overhaul is described, in which the procedure was used to level workloads of the various labor-trade shops. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号