首页> 美国政府科技报告 >Santa Ana River Main Stem Including Santiago Creek, Counties of Orange, Riverside, and San Bernardino, California. Phase I General Design Memorandum. Main Report and Supplemental Environmental Impact Statement
【24h】

Santa Ana River Main Stem Including Santiago Creek, Counties of Orange, Riverside, and San Bernardino, California. Phase I General Design Memorandum. Main Report and Supplemental Environmental Impact Statement

机译:圣安娜河主干包括圣地亚哥河,橙县,河滨和圣贝纳迪诺,加利福尼亚州。第一阶段通用设计备忘录。主要报告和补充环境影响声明

获取原文

摘要

The current plan for the main stem of the river includes construction of the Mentone Dam; flood plain management between Mentone Dam and Prado Reservoir; raising Prado Dam 30 feet and the acquisition line 10 feet; acquisition of the Santa Ana Canyon flood plain; channelization of the lower Santa Ana River; and acquisition, and preservation, of 92 acres of marshland at the mouth of the Santa Ana River. An integral part of the plan for Prado Dam, the Oak Street Drain plan involves construction of the channel recommended in the 1975 Survey Report from an existing debris basin to Prado Reservoir. The Santiago Creek plan involves detection storage of 100-year floodflows at existing gravel pits, with minimum downstream channelization. Facilities for recreation are included in the plans for the Santa Ana River and for Santiago Creek.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号