首页> 美国政府科技报告 >Manpower Forecasts and Planned Maintenance Personnel Skill Level Changes
【24h】

Manpower Forecasts and Planned Maintenance Personnel Skill Level Changes

机译:人力预测和计划维护人员技能水平变化

获取原文

摘要

The purpose of this research effort was to establish a method to estimate the effect of reducing maintenance personnel experience levels. The performance measures of interest were sortie/mission generation capability and manpower required. The United States Air Force maintenance data collection system to obtain failure rates, interviews with maintenance experts to determine estimated task times for normal and low skilled maintenance personnel, and the Logistics Composite Model to computer simulate the maintenance organization, are the tools which were utilized in this research study to develop such a method. Through this modeling technique productivity comparisons are made between normal(skill level 5) and low (skill level 3) maintenance personnel. A computer simulation model of the F-4E aircraft is used with maintenance task time for normal and low skill maintenance personnel.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号