首页> 美国政府科技报告 >Problems in Implementing the Army's CAPSTONE Program to Provide All Reserve Components with a Wartime Mission.
【24h】

Problems in Implementing the Army's CAPSTONE Program to Provide All Reserve Components with a Wartime Mission.

机译:实施陆军CapsTONE计划为所有后备役部队提供战时任务的问题。

获取原文

摘要

At the outset, CAPSTONE concentrated on the North Atlantic Treaty Organization-Warsaw Pact scenario and was later expanded to cover the Rapid Deployment Force Army and Korean scenarios. War plans and standing operating procedures are to be developed initially by the gaining-commands and provided to appropriate, aligned Reserve units so that such units can develop complementary war plans and related training requirements. Although the Army has taken steps recently to improve CAPSTONE management, the present management system does not provide the authorities in Europe and the Continental United States with the information needed to properly manage the program and to determine whether implementation is progressing satisfactorily. The present system has obscured the fact that many units had not been contacted by their gaining-commands, and some units had not received the required training and planning guidance. Improving the management system so that implementation progress can be properly monitored and corrective actions can be promptly taken as problems arise is essential to assure that training is properly focused. Otherwise, Reserve component units may be wasting valuable training time. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号