首页> 美国政府科技报告 >Smithland Dam, Ohio River. Foundation Report. Volume II. Photographs and Foundation Maps.
【24h】

Smithland Dam, Ohio River. Foundation Report. Volume II. Photographs and Foundation Maps.

机译:史密斯兰大坝,俄亥俄河。基金会报告。第二卷。照片和基金会地图。

获取原文

摘要

This report presents complete foundation records of conditions encountered during construction and the methods used to adapt the dam structures to these conditions. The report covers the construction of the Smithland Dam and Weir only. The construction for the twin 1200 foot locks is covered under a previous report. The high lift gated section of the dam consists of 12 piers and 11 gated bays. The dam section starts on the kentucky side of pier 12. A fixed weir consisting of granular filled and concrete capped steel piling cells extends from pier 12 some 1728 feet to the Kentucky bank. Contents (Volume II): Part I - Photographs; Part II - Foundation Maps. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号