首页> 美国政府科技报告 >Revegetation Study of Adobe Dam, Phoenix, Arizona. Task 6. Evaluation of Three Watering and Mulching Techniques on Transplanted Trees at Adobe Dam
【24h】

Revegetation Study of Adobe Dam, Phoenix, Arizona. Task 6. Evaluation of Three Watering and Mulching Techniques on Transplanted Trees at Adobe Dam

机译:亚利桑那州凤凰城adobe大坝的植被研究。任务6.评估adobe大坝移植树木的三种浇水和覆盖技术

获取原文

摘要

On the basis of these transplant studies, it is recommended that a minimal irrigation schedule be followed in the future for transplanted specimens. Transplanting early in the year reduces the watering requirements. Furthermore, after a one month adjustment period, trees watered once a month did well. Removal of supplemental water should be gradual, so as not to cause shock to the trees. Stone mulch appears to be both durable and effective as a mulching material, and can be cost effective if readily available on site. Fencing is a requirement for Palo Verde and Mesquite transplants but can be foregone on Cresote. Management following transplanting should include regular site inspections for signs of insect infestation and for watering problems. Inspection personnel should watch for signs that transplants have been watered adequately and that fences are intact and not restricting tree growth.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号