首页> 美国政府科技报告 >Load Tests of a through Truss Bridge before and after the Installation of an Arch-Superposition Scheme
【24h】

Load Tests of a through Truss Bridge before and after the Installation of an Arch-Superposition Scheme

机译:在安装拱形叠加方案之前和之后对桁架桥进行载荷试验

获取原文

摘要

Because so many pinned and riveted truss bridges currently are classified as structurally deficient, a need to develop an economical, practical alternative to bridge replacement exists. Rehabilitation by an arch-superposition scheme can effectively reduce truss member stresses and increase the bridge load capacity. This was verified by load tests conducted both before and after the installation of the arch-superposition scheme to Northumberland Country bridge number 50. The results showed that truss member stresses and deflections can be reduced at least 50% by the scheme which is approximately one-seventh the cost of bridge replacement. Bridge number 50 has been upgraded from a six to a 20 ton inventory rating. The theory, economics, and construction feasibility of the arch-superposition scheme have been verified.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号