首页> 美国政府科技报告 >Industrial Technology Modernization Program. Project 80. Increase Efficiency of Card Test/Device Test Areas by the Usage of Improved Material Handling Systems. Revision 1. Phase 2
【24h】

Industrial Technology Modernization Program. Project 80. Increase Efficiency of Card Test/Device Test Areas by the Usage of Improved Material Handling Systems. Revision 1. Phase 2

机译:工业技术现代化计划。项目80.通过使用改进的物料搬运系统提高卡测试/设备测试区域的效率。修订1.第2阶段

获取原文

摘要

The project addresses modernization of the printed circuit card test and final device assembly and test areas within the Flight Management and Targeting Systems Department. This task is to be accomplished through more efficient use of floor space, utilization of automated storage and retrieval systems, consolidation of printed circuit card testing, streamlining work flow, and installation of ergonomically designed work cell/work centers. Incorporation of these changes will result in increased productivity and test yields brought about a reduction in rework, training, and throughout time. Keywords: Ergonomic work stations, Machining, Specifications, Cost benefit analysis. (kr)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号