首页> 美国政府科技报告 >Contingency Construction Planning in the U. S. Armed Services, Including the Extent of Modular Construction.
【24h】

Contingency Construction Planning in the U. S. Armed Services, Including the Extent of Modular Construction.

机译:美国武装部队的应急建设规划,包括模块化建设的范围。

获取原文

摘要

This paper examines and compares the contingency construction plans and capabilities of the United States Navy, Air Force, and Army. A contingency is an event or possibility that must be prepared against. For the purposes of this paper, a contingency is further limited to a situation in which the military would be required to operate in locations without adequate existing facilities. It would most likely be a politically based conflict or natural disaster where military construction forces would be called upon to provide necessary facilities. The focus here is on construction design plans and construction forces, as these can not be readily procured through a military supply system as the need arises. Special emphasis is paid to the extent of modular construction in each Service's contingency construction program. Modular construction refers to the complex relationship between standardization and flexibility. A highly modular facility would be one built using standard tools, methods, materials, and design. Keywords: Military facilities; Combat readiness; Army/thesis. (mm)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号